Operation, Operation • 2 – Pitney Bowes DI425 FastPac Inserting Systems User Manual
Page 17
![background image](/manuals/740556/17/background.png)
Operation • 2
2-1
SV61656 Rev. A
About this Chapter
This chapter explains operation of the machine, assuming the job
you want to run is already programmed into the system.
If you haven’t programmed the job, please go to Programmng Jobs
on page 2-9.
Connecting Power
IMPORTANT! Read the safety information on
pages 1-1 and 1-2 of this guide before you
connect the machine.
Connect the power cord to the socket on the left side of the machine.
Plug the power cord into a suitable power outlet. Make sure the pow-
er outlet is near the machine and
is easily accessible.
Turn the power switch ON.