beautypg.com

16 manual handling, Important, General recommendations when handling – Glow-worm Betacom C User Manual

Page 66: Removal of carton from delivery van, Unpacking of appliance from carton

background image

66

16 Manual Handling

IMPORTANT.

With regards to the Manual Handling Opera-

tions, 1992 Regulations, the following lift operation exceeds the

recommended weight for a one man lift.

General recommendations when handling

Clear the route before attempting the lift.

Ensure safe lifting techniques are used – keep back straight – bend us-

ing legs. Keep load as close to body as possible. Do not twist – repo-

sition feet instead. If 2 persons performing lift, ensure co-ordinated

movements during lift. Avoid upper body/top heavy bending - do not

lean forward/sideways. Recommend wear suitable cut resistant gloves

with good grip to protect against sharp edges and ensure good grip.

Always use assistance if required.

Removal of carton from delivery van

Recommend 2 person lift or 1 person with use of sack truck. If 1

person is performing lift, straddle the load, tilt and place carton into po-

sition on truck. Recommend secure appliance onto truck with suitable

straps. Ensure safe lifting techniques are used – keep back straight

– bend using legs. Keep load as close to body as possible. If 2 persons

performing lift, ensure co-ordinated movements during lift. Always use

assistance if required.

Carriage of carton from point of delivery to point

of installation – ground floor.

Recommend 2 person lift or 1 person with use of sack truck. If 1 person

is performing lift, straddle the load, tilt and place carton into position on

truck. Recommend secure appliance onto truck with suitable straps.

Ensure safe lifting techniques are used – keep back straight – bend

using legs. Keep load as close to body as possible. If 2 persons per-

forming lift, ensure co-ordinated

movements during lift. Clear the route

before attempting the lift. If removing boiler from truck straddle the load

and tilt forwards to facilitate secure grip. Ensure safe lifting techniques

are used – keep back straight – bend using legs. Do not twist – repo-

sition feet instead. Take care to

avoid trip hazards, slippery or wet

surfaces and when climbing steps and stairs. Always use assistance if
required.

Carriage of carton from point of delivery to point

of installation – first or higher floor, cellar.

Recommend 2-person lift or 1 person with use of sack truck. If 1 person

is performing lift, straddle the load, tilt and place carton into position on

truck. Recommend secure appliance onto truck with suitable straps.

Ensure safe lifting techniques are used – keep back straight – bend us-

ing legs. Keep load as close to body as possible. If 2 persons perform-

ing lift, ensure co-ordinated movements during lift. Avoid upper body/top

heavy bending - do not lean forward/sideways. Clear the route before

attempting the lift. If removing boiler from truck straddle the load and

tilt forwards to facilitate secure grip. Ensure safe lifting techniques are

used – keep back straight – bend using legs. Do not twist – reposition

feet instead. Take care to avoid trip hazards, slippery or wet surfaces

and when climbing steps and stairs. Always use assistance if required.

Carriage of carton from point of delivery to point

of installation – roofspace.

Recommend 2-person lift. Ensure co-ordinated movements during

lift. Avoid upper body/top heavy bending - do not lean forward/side-

ways. Clear the route before attempting the lift. Take care to avoid trip

hazards, slippery or wet surfaces and when climbing steps and stairs.

When transferring appliance into roofspace, recommend 1 person to be

in roofspace to receive the appliance and other person to be below to

pass up and support appliance. Ensure safe lifting techniques are used

– keep back straight – bend using legs. Keep load as close to body as

possible. Always use assistance if required. It is assumed safe access,

flooring and adequate lighting are provided in the roof space. It is

recommended a risk assessment of the roof space area be carried out

before moving the appliance into the area to take into account access,

stability of flooring, lighting and other factors, and appropriate measures
taken.

Unpacking of appliance from carton.

Recommend 2 persons unpack appliance from carton. Always keep

working area clear. Recommend cut base end of carton and open

carton flaps, then tilt boiler forwards from its side onto its base and

remove carton by sliding up over the boiler. Ensure safe lifting tech-

niques are used – keep back straight – bend using legs. Keep load as

close to body as possible. Always use assistance if required. Dispose

of packaging in a responsible manner. Recommend wear suitable

cut resistant gloves with good grip to protect against sharp edges and

ensure good grip when handling appliance outside packaging.

Positioning of Appliance for Final Installation

– no obstructions.

This appliance is deemed to be a one person lift when removed from

the carton. Fit bracket securely onto wall before lifting appliance into

position. Obtain firm grip on front and sides of appliance, lift upwards,

ensure stable balance achieved and lift upwards to position in place

on bracket. Ensure safe lifting techniques are used – keep back

straight – bend using legs - when lifting load from floor level. Do not

twist – reposition feet instead. Keep boiler as close as possible to

body throughout lift to minimise strain on back. Ensure co-ordinated

movements to ensure equal spread of weight of load. Always use

assistance if required. Recommend wear suitable cut resistant gloves

with good grip to protect against sharp edges and ensure good grip
when handling appliance.

Positioning of Appliance for Final Installation

– above worktop, foreseeable obstructions etc.

This appliance is deemed to be a one person lift when removed from
the carton. Fit bracket securely onto wall before lifting appliance into

position. Obtain firm grip on front and sides of appliance, lift upwards,

onto worktop if practicable. Ensure stable balance achieved and lift

upwards to position in place on bracket. If 2 persons positioning onto

bracket obtain firm grip at front and sides/base of boiler. Ensure co-

ordinated movements during 2 person lifts to ensure equal spread of

weight of load. Ensure safe lifting techniques are used – keep back

straight – bend using legs - when lifting load from floor level. Do not

twist – reposition feet instead. Keep boiler as close as possible to body

throughout lift to minimise strain on back. Avoid upper body/top heavy

bending - do not lean forward/sideways. Always use assistance if re-

quired. Recommend wear suitable cut resistant gloves with good grip

to protect against sharp edges and ensure good grip when handling

appliance.

Positioning of Appliance for Final Installation –

within compartment etc. restricting installation.

This appliance is deemed to be a one person lift when removed from

the carton. Fit bracket securely onto wall before lifting appliance into

position. Obtain firm grip on front and sides of appliance, lift upwards,

onto worktop if practicable. Ensure stable balance achieved and lift

upwards to drop into place onto bracket. If 2 persons positioning onto

bracket obtain firm grip at front and sides/base of boiler. Ensure co-

ordinated movements during 2 person lifts to ensure equal spread of

weight of load. If 1 person positioning onto bracket recommend obtain

firm grip supporting base of boiler. Ensure safe lifting techniques are

used – keep back straight – bend using legs - when lifting load from

floor level. Do not twist – reposition feet instead. Keep boiler as close

as possible to body throughout lift to minimise strain on back. Always

use assistance if required. Recommend wear suitable cut resistant

gloves with good grip to protect against sharp edges and ensure good
grip when handling appliance.

Positioning of Appliance for Final Installation

– in roof space restricting installation.

This appliance is deemed to be a one person lift when removed from

the carton. Obtain firm grip on front and sides of appliance, lift up-

wards, ensure stable balance achieved and lift upwards to drop into

place onto bracket. If 2 persons positioning onto bracket obtain firm

grip at front and sides/base of boiler. Ensure co-ordinated movements

during 2 person lifts to ensure equal spread of weight of load. If 1

person positioning onto bracket recommend obtain firm grip support-

ing base of boiler. Ensure safe lifting techniques are used - keep back

straight – bend using legs - when lifting load from floor level. Do not

twist – reposition feet instead. Keep boiler as close as possible to body

throughout lift to minimise strain on back. Always use assistance if re-

quired. Recommend wear suitable cut resistant gloves with good grip

to protect against sharp edges and ensure good grip when handling

appliance. It is recommended a risk assessment of the roof space

area be carried out before moving the appliance into the area to take

into account access, stability of flooring, lighting and other factors, and
appropriate measures taken

.