9 plume management kit, 10 electrical connection, 25 plume management kit – Glow-worm Betacom C User Manual
Page 35: 1 electrical wiring
35
9 Plume Management Kit
9.25 Plume Management Kit
The Plume Management Kit: Part No. A2044100 (white) or
A2044000 (black) can be used to overcome many site issues.
The Plume Management Kit will fit to the Top Horizontal
Telescopic, Rear Horizontal Telescopic and Standard
Horizontal Flue. This enables the flue products to exhaust
further away from the boiler, thereby reducing the impact of
pluming.
NOTE: The flue air inlet can be sited closer to doors, opening
windows and air bricks, than stated in section 4.2, see
diagram 9.27.
The maximum length of the Plume Management Kit must NOT
exceed 2m with a horizontal concentric flue length of 1m max.
For each 90
o
bend or 2 x 45
o
bends the maximum length of the
Plume Management Kit must be reduced by 1m.
For more information contact Glow-worm, refer to page 2.
The Plume Management Kit is supplied with installation
instructions.
Refer to BS5546 or BS6798 for advice on disposal of boiler
condensate.
150mm.
MIN.
12997
Diagram 9.27
WARNING:
This appliance must be earthed.
● This appliance must be wired in accordance with these
instructions. Any fault arising from incorrect wiring cannot be
put right under the terms of the Glow-worm guarantee.
● All system components must be of an approved type.
Electrical components have been tested to meet the
equivalent requirements of the BEAB.
● Do not interrupt the mains supply with a time switch or
programmer.
● Connection of the whole electrical system and any heating
system controls to the electrical supply must be through a
common isolator.
● Isolation should preferably be by a double pole switched
fused spur box having a minimum contact separation of
3mm on each pole. The fused spur box should be readily
accessible and preferably adjacent to the boiler. It should be
identified as to its use.
● A fused three pin plug and shuttered socket outlet may be
used instead of a fused spur box provided that it is not used in
a room containing a fixed bath or shower.
● The boiler is suitable for installation in bathroom zones 2
and 3.
10 Electrical Connection
10.1 Electrical Wiring
The boiler is supplied factory wired complete with 1.5 m of
mains lead. All electrical connections to the mains supply must
be made in full accordance with the current I.E.E. regulations.
The boiler must be connected to an effective earth system.
A 3 amp fused three pin plug and shuttered socket outlet may
be used instead of a fused spur box provided that it is not
used in a room containing a fixed bath or shower.