6 installation preparation – Glow-worm Betacom C User Manual
Page 16

16
14339
14594
6.1 Appliance Pack
Please check the contents of the carton:
Appliance, Isolation Valves, Wall Hanging Bracket,
Wall Template, Service Installation and User Manual,
Guarantee Card and Benchmark Log Book, see diagram 6.1.
(Literature and appliance not illustrated)
Handling
IMPORTANT: With regards to the Manual Handling
Operations, 1992 Regulations, the following lift operation
exceeds the recommended weight for a one man lift, refer to
section 17 Manual Handling.
To remove the appliance, refer to diagram 6.2.
1. Carefully slit or remove the sealing tape being
careful not to scratch the appliance door.
2. Fully open the carton lid and remove any instructions
and components.
3. Read the instructions carefully before installation of
the appliance.
4. Roll the carton onto its open face.
5. Lift the carton free of the inner packaging.
6. Remove the mounting bracket and valve package.
6 Installation Preparation
Diagram 6.1
Diagram 6.2
7. Stand the boiler on its base within the expanded
polystyrene block and remove the top packaging piece.
8. If you wish to remove the expanded polystyrene base lie
the appliance on its back to do so.
6.2 Site Requirements
The boiler mounting wall should be suitable for the weight of
the appliance and be true and flat.
NOTE: Due to the varied site conditions we do not supply
fixings and advise that the installer should supply those which
are suitable.
CHECK IF 230V thermostat plug is
required to fit to PCB board.
WALL HANGING
BRACKET
CONDENSATE
OUTLET PIPE
COLD WATER
FILTER
C.H. ISOLATION
VALVE FLOW
SEALING
WASHERS
(5 OFF)
C.H. ISOLATION
VALVE RETURN
1
2
5
4
3
COLD WATER
ISOLATION VALVE INLET
D.H.W
OUTLET
SAFETY
DISCHARGE
PIPE
WALL
TEMPLATE
GAS ISOLATION VALVE