beautypg.com

11 commissioning, 5 setting operational pressure – Glow-worm Betacom C User Manual

Page 40

background image

40

14585

Diagram 11.5

11.5 Setting Operational Pressure

Minimum setting

Remove the sensing tube from the gas valve.

Remove one lead from the modulating gas valve coil, see

diagram 11.6.

Refer to diagram 11.7.

Connect a suitable pressure gauge the pressure outlet of the

gas valve.

Turn the boiler’s function switch to the ‘Winter’ position.

(Heating and Hot Water), see diagram 11.4

Turn the central heating temperature control to maximum

setting.

Remove the protective cover from the gas valve adjuster.

Turn the inner screw using a screwdriver, clockwise: to

increase the pressure setting, anticlockwise: to decrease the

pressure setting.

After correct adjustment see, ‘Boiler specification section’

page 8, re-connect the electrical connector and protective

cover and replace the sensing tube to the boiler.

Maximum setting

Remove the sensing tube from the gas valve, see diagram

11.5.

Remove the protective cover from the gas valve adjuster.

Push the ball inside the modulating gas valve coil using a

sharp pointed tool.

Turn the nut with a 10mm spanner (keeping the ball in without

any rotation) clockwise: to increase the pressure setting,

anticlockwise: to decrease the pressure setting.

After correct adjustment see, ‘Boiler specification section’

page 8.

Finally, replace the sensing tube to the gas valve.

ELECTRICAL

AND EARTH

CONNECTIONS

ELECTRICAL

PLUG

SCREW

SENSING TUBE

MODULATING

COIL

GAS VALVE AND

MANIFOLD INLET

CONNECTIONS

Diagram 11.6

15524

GAS VALVE

ADJUSTER

11 Commissioning