YSI 6200 User Manual
Page 43
YSI 6200 DAS USER Manual
YSI Massachusetts 508.748.0366, Fax 508.748.2543 Page 4-6
until the AC power installation is complete. If you connect the battery, and it is adequately charged,
the 6200 DCP will begin logging data to memory based on it’s last settings.
Figure 4.4 AC Powering of 6200 DCP
To meet compliance with UL3010, EN61010 and CSA 1010, install a power switch on the AC load
line external to the 6200 DCP enclosure. We recommend that you install the switch near the 6200
DCP enclosure (see junction box in Figure 4.4) and choose a suitable switch that can be locked.
(Note: AC on/off power switch and junction box is not included with the 6200 system.) Check
local electrical codes for proper installation.
Use the following precautions from UL 508 as a guide to safety for personnel and property.
1. AC connections and grounding must be in compliance with UL 508 and/or local electrical
codes.
2. This type 4/4X enclosure requires a conduit hub or equivalent that provides watertight
connection, REF UL 508-26.10.
3. Watertight fittings/hubs must comply with the requirements of UL 514B.
Conduit hubs are to be connected to the conduit before the hub is connected to the enclosure, REF
UL 508.26.10.
AC Power Receptacle...
3-prong male, recessed
Battery
Digital I/O
Analog Inputs
Phone
Solar Power In
Desiccant Pack
+
-
8’ AC Power Cable...
3-prong female and standard
120 VAC male connectors
COM Port
WARNING!
Power cord with plug is not
to be
used for permanent installation.
Battery
Digital I/O
Analog Inputs
Phone
Solar Power In
COM Port
Desiccant Pack
+
-
8’ AC Power Cable with
3-prong female connector
Conduit
Standard Outdoor
Junction Box
AC Power In
Conduit
100-240 VAC, 50/60 Hz
Switchable Power Module
CAUTION!
Install power switch as close as
possible to DCP enclosure.