beautypg.com

YSI 6200 User Manual

Page 2

background image

3

Table of Contents

Page

Section 1

Introduction

1.1 Description

1-1

1.2 General Specifications

1-2

1.3 How to Use this Manual

1-4

Section 2

Getting Started

2.1 Unpacking and Inspection

2-1

2.2 Installing EcoWatch DCP

2-2

2.3 Setting Up System Components for Checkout

2-3

2.4 Setting Up a 6-Series Sonde for System Checkout

2-6

2.5 Configuring the System 6200 with EcoWatch DCP

2-11

2.6 Testing the 6200 DCP

2-16

2.7 Testing Sensor Function

2-19

2.8 Displaying Data in EcoWatch DCP

2-21

Section 3

Setting Up and Calibrating 6-Series Sondes

3.1 Introduction

3-1

3.2 Communicating with a Sonde

3-1

3.3 Connecting a Sonde to a Computer with EcoWatch DCP

3-3

3.4 Preparing the Sonde to Communicate with the 6200 DCP

3-4

3.5 Installing and Calibrating Sonde Sensors

3-5

Section 4

Powering the Field Station

4.1 Introduction

4-1

4.2 General Wiring Information

4-1

4.3 Installing the Battery

4-4

4.4 Installing AC Power to the Field Station

4-5

4.5 Installing Solar Power to the Field Station

4-7

Section 5

Connecting Sensors to the Field Station

5.1 Introduction

5-1

5.2 Connecting the MET Suite

5-2

5.3 Connecting the Rain Gauge

5-2

5.4 Connecting the Pyranometer

5-3

5.5 Connecting One Sonde

5-3

5.6 Connecting More Than One Sonde to a Field Station

5-4

Section 6

Communicating with the Field Station

6.1 Introduction

6-1

6.2 Installing RS232 Direct Communication Link

6-6

6.3 Installing RF Radio Communication Link

6-7

6.4 Installing Phone modem Communication Link

6-9

6.5 Installing Cellular modem Communication Link

6-10

6.6 Setting Up Communication Parameters with EcoWatch DCP

6-11