YSI 6200 User Manual
Page 2
3
Table of Contents
Page
Section 1
Introduction
1-1
1-2
1-4
Section 2
Getting Started
2-1
2-2
2.3 Setting Up System Components for Checkout
2-3
2.4 Setting Up a 6-Series Sonde for System Checkout
2-6
2.5 Configuring the System 6200 with EcoWatch DCP
2-11
2-16
2-19
2.8 Displaying Data in EcoWatch DCP
2-21
Section 3
Setting Up and Calibrating 6-Series Sondes
3-1
3.2 Communicating with a Sonde
3-1
3.3 Connecting a Sonde to a Computer with EcoWatch DCP
3-3
3.4 Preparing the Sonde to Communicate with the 6200 DCP
3-4
3.5 Installing and Calibrating Sonde Sensors
3-5
Section 4
Powering the Field Station
4-1
4.2 General Wiring Information
4-1
4-4
4.4 Installing AC Power to the Field Station
4-5
4.5 Installing Solar Power to the Field Station
4-7
Section 5
Connecting Sensors to the Field Station
5-1
5-2
5-2
5.4 Connecting the Pyranometer
5-3
5-3
5.6 Connecting More Than One Sonde to a Field Station
5-4
Section 6
Communicating with the Field Station
6-1
6.2 Installing RS232 Direct Communication Link
6-6
6.3 Installing RF Radio Communication Link
6-7
6.4 Installing Phone modem Communication Link
6-9
6.5 Installing Cellular modem Communication Link
6-10
6.6 Setting Up Communication Parameters with EcoWatch DCP
6-11