Form I-UDB, P/N 202658 R14, Page 8
4.0 Clearances
and
Dimensions
4.1 Clearances
FIGURE 2 -
Installing
High Altitude
Pressure Switch
required above
6000 ft (1830M)
elevation
Instructions for Changing Pressure Switch
1. In the control compartment, locate the pressure switch.
2. Mark and disconnect the two wires attached to the pressure switch.
3. Disconnect the sensing tubes from the pressure switch.
4. Locate the two screws holding the switch mounting bracket. Remove the screws and
the pressure switch. Save the screws.
5. Using the same screws, install the high altitude pressure switch. Attach the sensing
tubes and wires.
Pressure
Switch
Model UDBP
Size
30
45
60
75
100
125
150 175 200 225 250 300
350
400
High Altitude Switch P/N
197031
197032
197031
201160
Negative Pressure OFF
Setpoint ("w.c.)
0.35
0.45
0.35
1.05
Label color
Purple
Pink
Purple
Brown
Model UDBS
Size
30
45
60
75
100
125
150 175 200 225 250 300
350
400
High Altitude Switch P/N 197031 197032 196362 197032 197031 197030 197031
201160
Differential Pressure
OFF Setpoint ("w.c.)
0.35
0.45
0.55
0.45
0.35
0.40
0.35
1.05
Label color
Purple
Pink
White
Pink
Purple Green
Purple
Brown
Downturn Nozzle Kits,
Option CD 2, 3, 4, or 5
Follow the instructions with the kit to install. Additional length beyond the front of the
unit is shown in
FIGURE 3.
FIGURE 3 - With Optional Downturn Nozzle, Dimension “A”
3.0 Uncrating and
Preparation
(cont’d)
3.2 Preparing for Installation (cont’d)
A
A
With 25-65°
downturn
with or
without
vertical
louvers
(Option
CD2 or CD4)
With 50-90°
downturn
with or
without
vertical
louvers
(Option
CD3 or CD5)
Dimension A
UDBP and
UDBS Sizes
Options CD2 & CD4
Options CD3 & CD5
inches
mm
inches
mm
30, 45
7-1/8
181
12-3/8
314
60, 75
8-5/8
219
15
381
100, 125
12-5/8
321
21-7/8
556
150, 175, 200
11-1/2
292
19-7/8
505
225, 250
14-1/2
368
25-1/8
638
300, 350, 400
18-1/2
470
32
813
Units must be installed so that the clearances in
FIGURE 4 are provided for com-
bustion air space, inspection and service, and for proper spacing from combustible
construction. Clearance to combustibles is defined as the minimum distance from the
heater to a surface or object that is necessary to ensure that a surface temperature of
90°F above the surrounding ambient temperature is not exceeded.
UDBP and UDBS
Sizes
30-125
150-400
inches
mm
inches
mm
Top*
6
152
14
356
Flue Connector
6
152
6
152
Access Panel
18
457
18
457
*Non-Access Side
24
610
24
610
Bottom
1
25
1
25
Rear
18
457
18
457
REZNOR
Top clearance is from top
of the heater cabinet.
Non access side
clearance is
from side of the
heater cabinet.
FIGURE 4 - Clearances
If the pressure switch needs to be changed, do that before the heater is operated; fol-
low the instructions in
FIGURE 2.