beautypg.com

Index – Reznor UDBS Unit Installation Manual User Manual

Page 43

background image

Form I-UDB, P/N 202658 R14, Page 43

A

Abnormal Heat Cycle Functions 30

Adjusting Blower Speed 18

Aircraft Hangars 3

APPENDIX 42

B

Belt 18

Belt Drive 19

Belt Guard in Option AZ6 and CD10 20

Blower 18

Blower Guard in Options AZ6, AZ7,

CD10, and CD12 20

Clean the Burner 36

Burner Maintenance 36

Burner Orifice 37

Burner Removal 36

C

California Warning Label 3

Certification 2

Checking Gas Flow Shutoff 39

Check installation after startup 33

Check the installation prior to startup

32

Check the Lights 40

Chlorine 6

Circuit Board (DSI Integrated Control

Module) 21

Clearances 8

LED Codes 29, 40

Combustion Air 16, 17

Combustion Air Pressure Switch 39

Combustion Air Proving (Pressure)

Switch 26

Commissioning 32

Confined Space 16

Contact 44

Continuous Blower Operation 31

Control Wiring 21

D

DDC Controls 28

Dimensions 9

Direct Drive 19

Disconnect Switch 39

Door Switch 39

Door Switch - Model UDBS only 26

Downturn Nozzle Kits 8

Drive 18

DSI Integrated Control Module 29, 37,

40

Duct Flange 17

E

Electrical Supply 20

F

Continuous Fan Operation 31

Fan/Blower Off Delay 30

Fan/Blower On Delay 29

Fault Modes 31

Flame Sensor 38

fuse 37

G

Garages 3

Gas Connection Size 13

Gas Conversion Kits 13

Gas Supply 12

Gas Supply Line 13

Gas Valve 27, 38

Gas Valve ON/OFF Control Knob 33

Gas Valve Relay Fault 31

Guards 20

H

Hanging the Heater 11, 12

Hard Lockout 31

HAZARD INTENSITY LEVELS 2

Hazard Labels and Notices 2

Lower Portion of the Heat Exchanger

37

Heat Exchanger Maintenance 35

High Altitude Capacity 15

High Altitude Derate 14

High Altitude Kit 7, 8

I

Ignition System 29, 37, 38

Ignition Trial 29

Ignitor 37

Installation Codes 3

L

Leak-test 12

Lifting 11

LED lights 29

Limit Control 26, 39

Limit Switch 30

Literature Bag 34

Location 6

Unit Heater Location 4

Location of Controls 35

Lockout 31

optional vertical louvers 7

M

Maintenance Procedures 35

Maintenance Schedule 34

Massachusetts Requirement 3

Blower Motor 27

Motor 38

Venter Motor 38

Multiple Heater Control 27

N

Normal Heat Cycle 29, 30

O

Operation 32

Option AX4 17

Option CC1 7

Option CC2 or CC6 3, 7

Option CD 2, 3, or 4 8

Option CL31 27

Option CL32 27

Option CM3 27

Option DJ20 or DJ21 7

Options D10 and D14 28

Orifice Pressure 13

P

Polytube Adapter 17

Post Purge 30

Power Interruption 31

Preparing for Installation 7

Prepurge 29

Pressure Switch 30

Pressure Switch Settings 26

PRESSURE TESTING SUPPLY PIPING

12

S

Mounting the Sensor 28

Soft Lockout 31

Sound Data 5

Spark Gap 38

Startup 32

stepdown transformer 7

stepdown transformer, Option CG2 or

CG4 20

Supply Wiring 20

Suspending 11

Suspending the Heater with Threaded

Rods 11

suspension points 9, 10

Swivel Connectors 12

T

TECHNICAL DATA 42

Terminal Strip for 24-volt 21

Thermostat 27

Unit Mounted Thermostat 27

Throw 4

Transformer 39

500VA Stepdown Transformer 20

Troubleshooting 40, 41

Troubleshooting Flowchart 40

TURN OFF GAS 33

U

Uncrating and Inspecting 6

Undesired Flame 31

V

Valve Outlet Pressure 14

Valve Outlet Pressure Settings by

Elevation 14

Vent 39

Vent/Combustion Air 39

Vent/Combustion Air Kit 3, 7

vent cap 7

Venter Motor 27

Venter Wheel 38

Venting Manual 3, 6

Vent System Testing Procedure 33

460 or 575 supply voltage 20

W

Warranty 3

Weights 11

WHAT TO DO IF YOU SMELL GAS 32

Wiring Connections 21

Wiring Diagram for Model UDBP or

UDBS, Sizes 150-400, Single Stage

24

Wiring Diagram for Model UDBP or

UDBS, Sizes 150-400, Two Stage 25

Wiring Diagram for Model UDBP or

UDBS, Sizes 30-125, Two Stage 23

Wiring Diagram for Model UDBP or

UDBS Sizes 30-125, Single Stage 22

Wiring Diagrams 22

INDEX

This manual is related to the following products: