beautypg.com

0 maintenance and service (cont’d), Caution: use of eye protection is recommended, 2 maintenance procedures (cont’d) – Reznor UDBS Unit Installation Manual User Manual

Page 36

background image

Form I-UDB, P/N 202658 R14, Page 36

Inspect and Clean

the Burner

Burner Body Support (at least two per unit) -

Remove screw attaching to secondary air shield.

Support remains attached to the burner.

Secondary

Air Shield

Gas

Valve

Control Bracket Screws -

Loosen bracket; slide right.

Orifice

Orifice Adapter

Locking Nut

Secondary Air Baffle

(Qty varies per size.)

Mark locations before removing.

Burner

Assembly

Venturi Tube - Slide right; rotate inward; pull out.

Slide right

Slide righ

t

Disconnect gas train

at orifice and outside

the cabinet; slide to

the right.

1. Outside the cabinet, shut the gas supply off at the manual valve ahead of the

union.

2. Turn off electric supply.

3. Disconnect the gas supply at the union outside of the cabinet.

4. Remove the access panel.

5. Disconnect and Move the Gas Train - At the gas valve, mark and disconnect the

wires. Carefully remove the burner orifice and orifice adapter locking nut. Slide the

orifice adapter out through the bracket on the burner pushing the gas train to the

right. This will move the gas train out of the way.

6. Move the Control Assembly - Remove the two screws holding the control

assembly bracket. Being careful not to disconnect any wires, slide the control

assembly to the right.

7. Remove Secondary Air Baffles (Sizes 60-400 only) - Vertical along the right side

of the burner, locate the flat plate(s) identified as the secondary air baffle(s). The

quantity of baffles could be one to four depending on heater size. Each baffle is

held in place by one screw.

For re-assembly, on the secondary air shield, mark

the location (top and bottom) of each baffle. Remove all baffles.

8. Remove Burner Assembly

a) Locate the burner body supports. Depending on the size, the burner will have

two or more supports. At each support, remove the one screw that attaches it to

the secondary air shield

b) Holding the venturi tube, slide the entire burner assembly slightly to the right to

disengage the burner from the supports on the left. Then rotate the open end

of the venturi tube inward toward the heater. Carefully pull the burner assembly

out of the cabinet.

With the burner assembly removed, shine a flashlight on the burner ribbons. Look for

carbon buildup, scale, dust, lint, and/or anything that might restrict flow through the

spaces between the burner ribbons. Holding the burner assembly so that any foreign

material will fall away from the burner, use a stiff bristle brush to loosen and remove

any foreign material(s). If the burner is excessively dirty, remove one of the burner end

caps. Remove the four screws that hold the end cap to the burner housing. Lightly tap

the end cap to remove it.

FIGURE 23 - Burner

Removal (UDBP

illustrated; same

process

for both

UDBP and

UDBS)

10.0 Maintenance

and Service

(cont’d)

CAUTION: Use of

eye protection is

recommended.

Burner Removal Instructions (Refer to FIGURE 23.)

10.2.2 Burner Maintenance

This heater is equipped with a

T

CORE

2

®

burner.

Inspect the burner/control compartment annually to determine if cleaning is necessary.

If there is an accumulation of dirt, dust, and/or lint, clean the compartment and follow

the instructions below to remove and clean the burner.

10.2 Maintenance

Procedures

(cont’d)

This manual is related to the following products: