beautypg.com

B&C Technologies DI-325 Industrial User Manual

Page 72

background image

OPERATING AND PROGRAMMING INSTRUCTIONS

8-41

All machine configurations will be at the default value when the dryer is shipped. So, the

machine configurations also have to be set according to the type of dryer and the available options.

The controller will start up in the default language, which is English. If necessary the desired

interface language can be changed as described in chapter 6.6.2.

Pre-assembly of parts before installation

1.

Check that all the parts are present.

2.

Place the controller (1) on a clean, flat work surface with electrostatic protection so that
the display side faces up. Insert 8 bolts in the controller from the front (display side) so
that the shaft of the bolts point towards the work surface.

3.

Remove the plastic foil from the displays on the front of the controller. Ensure that no
dust or debris is present and the front surface of the controller is clean.

4.

Remove the paper covering from the back of the front plate (3) to reveal the adhesive
underneath.

5.

Carefully position the front plate (3), ensuring that the windows in the front plate (3) are
aligned with the displays and LEDs on the controller (1). Using a stroking motion apply
gentle pressure across the surface of the front plate to ensure it is stuck down well.


NOTE: do not remove the protective plastic foil from the front of the front plate as this is needed to
protect it from damage during installation and shipment.

6.

Turn the controller (1) face-down on the table and carefully position the foam rubber
gasket. Ensure that the bolts fitted in step 2 pass through the holes in the gasket. These
will hold the gasket in place prior to fitting.


NOTE : do not install the battery until the unit is fitted in the machine and ready to be tested as it
will reduce the life of the battery.

Installation in a machine

1.

Mount the pre-assembled controller in the machine using M3 countersunk bolts and the
gasket supplied.

2.

Connect the wires to the machine according to the specifications for your machine.
(connections overview for controller in chapter 2.1)

3.

Install the battery in the holder on the rear of the controller.

4.

Power the machine and check that it is operating correctly according to the machines test
procedure.

5.

Setup the date and time. (chapter 6.6.1)

6.

Setup the startup logo. (chapter 6.8, parameter 1)

7.

Change the language if required. (chapter 6.6.2)