ADS Environmental Services FlowAlert QR 775011 A2 User Manual
Page 98
![background image](/manuals/599711/98/background.png)
4-30
ADS FlowAlert Manual
Completed telephone cable connected to TELEMETRY/ANTENNA port on
monitor
Wiring the Telephone Cable to the Lightning
Protection Module
Next, wire the telephone cable to the lightning protection module
(ADS p/n 103313) in the following way:
1. Open the front cover of the lighting protection module, and
remove the nuts, washers, and card from the posts inside the
module. Leave only the bottom-most nut on each post.
2. Slice a hole in the grommet in the bottom of the module, and
run the telephone cable up through the grommet into the
module.
3. Place the lugs for the following wires onto the designated posts,
and then re-place a washer and nut onto each post:
Red wire to Telco network interface
Top left post (tip)
Green wire to Telco network interface
Bottom left post
(ring)
Blue wire from monitor
Top right post (tip)