ADS Environmental Services FlowAlert QR 775011 A2 User Manual
Page 173

7-8
ADS FlowAlert Manual
Battery pack with foam insert disconnected from monitor
6. Place the new battery pack into the enclosure without pinching
the cables, and carefully push the excess cabling between the
battery pack and the enclosure.
7. Connect the new battery pack to the circuit board power cable.
8. Call the monitor or connect to the monitor on site using a serial
communication cable to verify communication.
9. Carefully replace the monitor lid onto the enclosure (without
pinching the battery cables), and torque down the bolts
securing the chassis to the enclosure to 35 inch pounds (+/- 5
inch pounds).