ADS Environmental Services FlowAlert QR 775011 A2 User Manual
Page 199

In-4
ADS FlowAlert Manual
wiring telephone cable to
lightning protection module,
4-30
monitor, 6-1
mounting to a manhole ladder
rung, 6-12
mounting to the manhole rim,
6-6
mounting to the manhole wall,
6-3
mounting sensor to band, 3-23
mounting sensor to ring, 3-16
mounting sensor to strap, 3-31
mounting sensor to wall, 3-31
pressure depth sensor, 3-6, 3-24,
3-27
securing cable to band, 3-29
ring, 3-8, 3-18
securing sensor cable in manhole,
3-36
sensor
ring assembly, 3-8
special, 3-20
1/2-band mount, 3-27
3/4-band mount, 3-24
securing sensor cable to band,
3-29
standard, 3-6
telephone service, 4-22
mounting lightning protection
module, 4-25
preparing telephone cable,
4-26
running cable between monitor
and service locations, 4-23
wiring lightning protection
module to network interface
box, 4-32
wiring telephone cable to
lightning protection module,
4-30
wiring telephone cable to
monitor, 4-28
wireless antenna in a pedestal,
4-9
wireless antenna in the road, 4-3
wireless antenna on a roof or other
protected structure, 4-16
wireless communication, 4-2
SIM card, 4-17
installation table, 5-6
IP address
obtaining address from monitor,
7-4
L
landline communication, 2-6, 2-7
installation, 4-22
preparing telephone cable,
4-26
running cable between monitor
and service locations, 4-23
wiring lightning protection
module to network interface
box, 4-32
wiring telephone cable to
lightning protection module,
4-30
wiring telephone cable to
monitor, 4-28
mounting lightning protection
module, 4-25
troubleshooting, 7-16
launching the Profile software, 5-2
lightning protection module
connecting telephone cable, 4-30
connecting wires to network
interface box, 4-32
inspection, 7-10
installing the ground rod, 4-25
mounting, 4-25
specifications, A-6
logs, 5-47