C h a p t e r 5 configuration and activation, Configuration and activation – ADS Environmental Services FlowAlert QR 775011 A2 User Manual
Page 105
5-1
C H A P T E R 5
Configuration and Activation
After installing the ADS
®
FlowAlert
™
monitor, pressure depth
sensor, and float switch(es) and setting up communication, it is
necessary to configure and activate the monitor to begin taking flow
depth measurements and recording data at the monitor location.
This chapter contains general instructions on the following activities
concerning monitor configuration and activation:
Creating a monitor location
Creating an installation (pipe) table
Selecting and editing devices
Setting the communication parameters
Activating the monitor
Configuring power savings (optional)
This chapter also includes the procedure for running diagnostics on
the devices, collecting data from the monitor, and upgrading the
firmware (embedded software) in the monitor.
Refer to the Profile
®
User's Guide (#950015**) for more detailed
instructions on installing the software, collecting monitor data, and
configuring, activating, and confirming the monitor.