Gathering the tools and equipment – ADS Environmental Services FlowAlert QR 775011 A2 User Manual
Page 45

3-22
ADS FlowAlert Manual
Quantity
Description
ADS Part Number
10
anchor cable tie
I05-0004
15
¼-
× 2 ¼-inch anchor bolt (with
7/16-inch nut and washer)
I01-0002
1
3/8-
× 2-inch stud
I01-0009
1
3/8-inch x 3-inch anchor bolt and
nut
I01-0003
2
3/8-inch x 1-inch stainless steel hex
bolts
I01-0001
4
3/8 – 16 stainless steel hex nuts
I15-0002
5
3/8-inch stainless steel flat washers
I55-0001
2
4-40
× 5/16-inch screw
I35-0001
8
6-32 washer
I55-0002
4
6-32
× 1-inch machine screw
I35-0004
4
6-32
× 5/16 inch nut
I15-0003
15
plastic push mounts
I01-0006
1
special predrilled 8-foot metal band
I40-0007
Gathering the Tools and Equipment
Gather the following tools for the installation:
Battery-powered hammer drill with assorted bits – including
the following, at a minimum:
3/8-inch x 4-inch (minimum length) masonry bit
¼-inch masonry bit (F35-0018)
5/16-inch carbide-tipped drill bit (include smaller bits)
4-pound hammer
Rubber mallet
Wrenches
Screwdrivers (flathead and Phillips head of assorted sizes)