beautypg.com

Planting – Great Plains YP2425F-2470 Operator Manual User Manual

Page 44

background image

40

YP2425 & YP2425F

Table of Contents

Index

Great Plains Manufacturing, Inc.

401-406M

Table of Contents

Index

2014-07-14

Planting

When all checklist items are complete, a planting pass
normally consists of a few simple steps)

1.

Lower planter mainframe

2.

Extend a marker

3.

Drive forward

4.

Scan monitors and controls. Check for errors, alerts
and out-of-limits events. Check planting rate reports.

5.

Raise marker

6.

Raise planter mainframe

7.

Turn

8.

Extend marker as needed for next pass

9.

Subsequent Passes resume at step 1.

When reloading seed and fertilizer, check consumption
against anticipated use to that point.

Figure 38

Planting

26044

This manual is related to the following products: