Field operation – Great Plains YP2425F-2470 Operator Manual User Manual
Page 41
Great Plains Manufacturing, Inc.
Operating Instructions
37
2014-07-14
401-406M
Field Operation
Perform all steps in “Pre-Start Checklist” on page 25
and “Field Set-Up Checklist” on page 35.
First Pass Operation Checklist
Page
1. Raise planter and line up at start of
first planting row
2. Set tractor 3-point hitch to “depth
control” operation (and not load
control)
-
3. Unfold marker on next-row side.
4. Set fan hydraulic circuit to low flow,
engage circuit. Gradually adjust
hydraulic flow to 3800 rpm.
5. Engage drive via seed monitor. Refer
to seed monitor manual.
-
6. If planter has a fertilizer system
integrated with the DICKEY-john seed
monitor, set the “Fert.Pump” switch on
the Clutch Folding Module to ON.
7. In the CLUTCH cluster of the Clutch
Folding Module, set all switches,
including Master, to ON.
8. Pull forward, lower planter, and begin
planting for a short distance.
9. Stop. Assess:
• planting depth
• seed spacing
• press wheel operation
• fertilizer application (if in use)
10. Make necessary adjustments
Sharp Field Turns Checklist
Page
1. Fold marker
2. Raise planter
3. Make turn
4. Lower planter
5. Unfold marker on next-row side.
6. Resume planting.
Suspending Planting Checklist
Page
1. Stop tractor
2. Fan hydraulic circuit to Float or Neutral
3. Raise planter
4. Fold Marker
Ending Planting Checklist
Page
1. Suspend operations as above, then
2. Install lift locks
3. Lights ON
-
4. Transport