beautypg.com

Rack mounting, Table 8 - panel rack adapters, Required tools – Rockwell Automation 6186M-xxxx Industrial Performance Monitors User Manual User Manual

Page 28: Mounting guidelines, Mounting the monitor in a rack

background image

28

Rockwell Automation Publication 6186M-UM002B-EN-P - March 2012

Chapter 2

Installing the Monitor

Rack Mounting

You can install the 1200M, 1500M, and 1700M monitors directly into an
EIA-rack cabinet by using the appropriate rack adapters.

Required Tools

You need the optional rack-adapter kit and a #2 Phillips screwdriver.

Mounting Guidelines

Observe these guidelines when installing the monitor in an EIA-rack cabinet:

The height of the cabinet must accommodate the monitor’s panel height.

The depth of the cabinet must accommodate the monitor’s depth plus rear

clearance for cables and airflow. A cabinet depth of 112 mm (4.4 in.) is
sufficient.

Mounting the Monitor in a Rack

Follow these directions to mount the monitor in a rack.

1. Place the 1200M, 1500M, or 1700M monitor in the rack adapter (1) and

attach it to the rack adapter with the mounting clips provided (

2).

Table 8 - Panel Rack Adapters

Cat. No.

Description

6189V-MRA12

Rack adapter for 1200M monitor

6189V-MRA15

Rack adapter for 1500M monitor

6189V-MRA17

Rack adapter for 1700M monitor