Step routine – Rockwell Automation 1413-ME-PEA Capacitor Bank Controller - Series B User Manual
Page 56
Publication 1413-UM001C-EN-P - May 2006
54 Add Special Functionality
Part 2 Example
Part 3
If KVAR_LEAD_WAIT_2_TRIP (B56:0/7) is high and STEPS_REQUIRED
(N7:58) is greater than 0, then Output Energize
KVAR_LAG_TRIP_STEP (B56:0/3) and unlatch
KVAR_LAG_WAIT_2_ADD (B56:0/7). This will trip the required step
defined by the step routine.
See Part 3 Example.
Part 3 Example
Step Routine
This section defines what step to use or trip. The outputs for the Step
Routine are USE_STEP_NUM (N58:1) and TRIP_STEP_NUM (N58:0).
When a step is controlled to be used, the step equal to the value in
USE_STEP_NUM (N58:1) will be actuated. When a step is controlled to
be tripped, the step equal to the value in TRIP_STEP_NUM (N58:1)
will be tripped.