beautypg.com

Landoll HSB 71-1 through 131-1 SOIL BUILDER Coulter Chisel - Extended Frame User Manual

Page 12

background image

1K705

LUBRICATION

On your Brillion Soll Builder the

following grease fittings should

be greased after each 8 hours

of operation.

Also the four pins on the

links from rockshaft to the

wheel arms.

Each season repack the wheel

bearings and the walking beam

pivot bearings on machines

equipped with walking beam axles.

The four cast bearings on the

coulter gangs, the six steel

bearings on the wheel arms

and rockshaft and the center

bearing on the rockshaft.

8

HRS.

8

HRS.

Page 10

791rev5-30-05

This manual is related to the following products: