beautypg.com

9 connect the peripheral units and switch them on – Toshiba Magnia Z300 User Manual

Page 75

background image

Installing and Removing Hardware

Before starting operation

53

8 Attach the server panels and outer covers to the server.

In case of the Rack Type, fit the panels to the server before
mounting it on the rack.

9 Connect the peripheral units and switch them on.

10 Plug the server's power cable connector into an AC outlet (or

UPS) and then switch on the server.

Some optional devices need to be setup with jumper switches
and DIP switches.
See “BIOS setup utility” on page 39.