Re-install strainer, Adjust strainer height, Temporarily attach strainer – Sioux Chief Linear Shower Drain - StreamLine - Full Mortar Bed User Manual
Page 14: Tile and grout
![background image](/manuals/468101/14/background.png)
25. Re-Install Strainer
Note: Strainer attachment holes are not symmetrical. If screws do not
align with holes in drain base, turn strainer end-to-end.
Place strainer over height adjustment screws. Confirm
that strainer is flush with all tiles. Fasten with three
2-1/4" pan head screws. Do not over-tighten.
24. Adjust Strainer Height
Remove strainer. Remove tape from strainer. If factory
installed film, start peeling at one end of strainer. Peel
side to side (sawtooth pattern) to other end of strainer.
Remove remaining residue by wiping with a soft cloth
and WD40™ or Goo Gone™.
Place thin end of height adjustment tool on tile and rest
other end on height adjustment screw. Adjust screw for
level. Repeat for all height adjustment screws.
22. Temporarily Attach Strainer
Note: Strainer attachment holes are not symmetrical. If screws do not
align with holes in drain base, turn strainer end-to-end.
Place strainer over height adjustment screws.
Temporarily fasten with three 2-1/4" pan head screws.
Do not over-tighten.
23. Tile and Grout
Be certain strainer is protected with tape. Allow for
1/16" clearance between strainer and tile.
Caution: Do not grout or seal this space.
Tile and grout all surfaces following manufacturers
instructions and TCNA guidelines.
Strainer
2-1/4" Screws
From Full Mortar Bed Adapter Kit
Height Adjustment Tool
Remove Strainer
Adjust Screws
1/16" Cleanance
Do Not Seal Or Grout
Tile
Strainer
2-1/4" Screws
From Full Mortar Bed Adapter Kit
13 www.siouxchief.com
Installation Guide