Secure shower pan liner, Prepare shower pan liner (cont.) – Sioux Chief Linear Shower Drain - StreamLine - Full Mortar Bed User Manual
Page 10
8. Secure Shower Pan Liner
A. Seal Drain Base
Lift out Shower Pan Liner. Remove tape, leaving tape
over drain hole only.
Apply a 1/8" continuous bead of NobleSealant 150
around chamfer on base flange and another bead in
groove on drain base.
B. Pre-Formed Corners
Apply NobleSealant 150 to any pre-formed corners.
C. Press Shower Pan Liner Into Sealant
Align Shower Pan Liner, fit or re-tuck corners and firmly press
Liner into sealant on drain base and any pre-formed corners.
7. Prepare Shower Pan Liner (cont.)
Drain On Center
Layout 5
Shower Pan Liner must turn up the walls a minimum
of 3" above finished shower curb and 6" above floor in
showers without curbs.
Prior to installing Shower Pan Liner, install pre-formed
outside corners as needed, (available separately)
following manufacturer’s instructions.
Measure width of shower floor across drain base.
Lay Shower Pan Liner flat. Measure and mark Shower
Pan Liner.
Fold and crease for upturns.
Note: Do not secure Shower Pan Liner at this time. Preformed curbs
may also be used. See manufacturer’s instructions.
2 Beads
NobleSealant 150
Chamfer
Groove
Fold
6" min.
9 www.siouxchief.com
Installation Guide