beautypg.com

Adjust for break out, Operation – Hawk Industries Hawkjaw Sr. Manual ALS Serial Numbers 1 to 100 User Manual

Page 25

background image

Adjust for Break Out

Operation

25

Operation

1. Measure the drill pipe tube with

OD calipers.

2.

Tube Size

Use

9 1/2"

Eighth Hole

(8H)

8 "

Seventh Hole

(7H)

7 "

Sixth Hole

(6H)

6 "

Fifth Hole

(5H)

5 1/2"

Fourth Hole

(4H)

4 1/2"- 5 1/2"

Third Hole

(3H)

3 1/2"- 4"

Second Hole

(2H)

2 7/8"

First Hole

(1H)

3. Use the 1 1/2" wrench to remove

the two Adjust bolts (AB).

4. Slide the whole Drive unit (D)

forward or backward to the
appropriate holes.

5. Replace Adjust bolts (AB) and

tighten.

Tools Required

OD calipers, 1 1/2" wrench

Adjusting the Spinner

AB

2H 3H 4H 5H 6H 7H

1H

8H

D

SAB

SSA

1. Loosen the four spinner slide assembly bolts

(SAB).

2. Re-adjust the spinner slide assembly (SSA) forward

so that the push cylinder strokes out far enough to
reach the connection.

3. Tighten the spinner slide assembly bolts (SAB).

Spinner performance could be reduced if the

spinner push cylinder stroke is insufficient to
allign the spinner correctly with the drill pipe,
especially on sizes above 5 1/2" tube. To correct
this problem:

NOTE