Avaya Media Gateway G250 User Manual
Page 163

Configuring the Converged Network Analyzer Application
Issue 5 October 2007
163
Test Plug 1
Administrative State
Administrative status of the test plug. Possible values are:
●
Enable
●
Disable
Test Plug 1 Status
The status of the Test Plug operation. Possible values include:
●
Unregistered - The test plug is attempting to register and is
currently unregistered.
●
Scheduler List Exhausted - The test plug has exhausted its
scheduler list at least once, and is now attempting to register.
●
Idle - The test plug is registered, but idle.
●
Test - The test plug is running a test.
●
Suspend - The test plug is idle because a test was cancelled.
●
No IP Address - No IP address is configured for the test plug
interface.
●
Bad IP Address - The configured test plug IP address is not
properly configured for the test plug interface.
●
Empty Scheduler List - The scheduler list is empty. No
testing events were configured for this device.
●
Failed Control Port Bind - The test plug failed to bind the
UDP control port.
●
Failed FTP Port Bind - The test plug failed to bind to the UDP
port for RTP tests.
●
Suspend By Rate Limiter - The test plug was suspended by
its test rate limiter.
Table 60: CNA Configuration - Test Plug Parameters (continued)
Field Description
2 of 2