beautypg.com

Verifying the installation – Allied Telesis AT-MCF2000M User Manual

Page 55

background image

AT-MCF2000M Management Module Installation Guide

55

Verifying the Installation

This procedure verifies the installation of the
AT-MCF2000M Management Module. The procedure
assumes the chassis with the module is powered on.

To verify the installation of the module, perform the
following procedure:

1.

Verify that the Power LED on the module is green.

2.

If you connected a network cable to the 10/100/
1000Base-T Management Module, verify that the L/A
(Link/Activity) LED is green or amber.

3.

If you connected a cable to the Stack port, the Link/
Activity LED for the port should be steady or flashing
green.

Note

If there are any problems, refer to Chapter 3,
“Troubleshooting” on page 63
for assistance.