Relations between “cc” command issues and status – HP XP P9500 Storage User Manual
Page 146
Display Formats
LDEV Mapping
RAID6[Group Group number - Sub number]
SNAPS[PoolID poolID number ]
Snapshot S-VOL
UNMAP[Group 00000]
Unmapped
E-LUN[Group External Group number]
External LUN
Relations between “cc” command issues and status
The migration volumes can be handled by issuing the RAID Manager commands (pair creation
and pair splitting commands). The validity of the specified operation is checked according to the
status of the paired volume (primary volume).
shows the relations between the migration volume statuses and command
acceptances.
Table 32 Command issues and pairing status transition
Pair Splitting
Pair Creation
Command:
Simplex -S
-m cc
Pairing Status CC:
Acceptable
Accepted
1.
1 SMPL
2 to 3
2 to 4
Accepted
Acceptable
1.
2 COPY to 3
Accepted 1
1.
3 PSUS
Accepted 1
1.
4 PSUE PDUB
Legend:
Accepted: A command is accepted and executed. When the command execution succeeds, the status changes to that
of the shown number.
Accepted: A command is accepted and executed. When the command execution succeeds, the status changes to that
of the shown number.
Acceptable: No operation is executed, though a command is accepted.
Shaded portions: Command execution is rejected and the operation terminates abnormally.
Other commands and options (e.g., pairresync…) for operating a paired-volume are rejected.
The “-m cc” option cannot be specified with “-split” option in the same command.
146
Data replication operations with RAID Manager