Installing the Server in a Rack
Rack Installation Overview
Installing the ProLiant DL760 G2 server in a rack requires the following steps
(detailed later in this chapter):
1. Select a site and unpack the server. Refer to the “Selecting a Site” and “Shipping
Box Contents” sections in this chapter.
2. Remove the power supply and I/O module shipping brackets and the shipping
screws. Refer to “Removing the Shipping Safeguards” later in this chapter.
3. Remove the processor and memory module, I/O module, media module, and
power supplies to lighten the chassis.
4. Install any expansion boards or other options, such as additional memory. Refer
to Chapter 4 and Chapter 5 to install many of the major options.
NOTE: If the operating system is preinstalled on the server, refer to the Factory-Installed
Operating System Software User Guide that is included with the server.
5. Install the chassis in the rack and replace the modules and power supplies.
NOTE: Refer to the rack template included with the server for more details on installing
the server in a rack.
6. Connect the following cables: keyboard, mouse, monitor, network, storage, and
power. Refer to Chapter 6 for more information.
2-2
HP ProLiant DL760 Generation 2 Server User Guide
HP CONFIDENTIAL
Writer: Jennifer Hayward File Name: c-ch2 Installing the Server in a Rack.doc
Codename: Pioneer Part Number: 201264-002 Last Saved On: 6/17/03 9:22 AM