beautypg.com

Controlled Products Systems Group 1603-080 User Manual

Page 4

background image

1603-065-T-4-13

2

SPECIFICATIONS

1

UL 325 Entrapment Protection

Safety Information for Vertical Barrier Arm and Spikes

3

4-5

SECTION 1 - INSTALLATION OF OPERATOR

6

6

7
7

8

1.1

Operator Positioning and Conduit Requirements

1.2

Concrete Pad Requirements

1.3 Mount

Operator

1.4

Dual Operator Installation (Primary/Secondary)

SECTION 2 - WIRING

9

9

9

10

11

2.1

High Voltage Wire Runs

2.2 High Voltage Terminal Connections
2.3 Main

Terminal

Description

2.4 Control

Wiring

SECTION 9 - TECHNICAL INSTRUCTIONS

32

9.1 Maintenance

Schedule

9.2 Diagnostics

Check

9.3 Troubleshooting

9.4 Accessories Parts List
Wiring Schematics

32

33

33-34

35

36-37

SECTION 5 - ARM INSTALLATION

20

5.1 Mounting

Hub

5.2 Mounting Aluminum Arm

20

20

SECTION 6 - ADJUSTMENTS

21

6.1 1601 Circuit Board Description and Adjustments

6.2 DIP-Switch SW 1 and SW 2 Settings

6.3 Magnetic Limit Adjustment

6.4 Reverse Sensor Adjustment

6.5 Manual Operation of Arm and Spikes

21

22-24

25

25

26

SECTION 7 - OPTIONAL CONVENIENCE OPEN SYSTEM

27

7.1 Operating

Mode

7.2 DC System Description

7.3 DIP-Switch

Settings

27

28

28

SECTION 8 - OPTIONAL ACCESSORIES INSTALLATION

29

8.1 Contact Sensor (Reversing Edge)

8.2 Fan

Kit

8.3 Heater

Kit

29

30

31

TABLE OF CONTENTS

SECTION 4 - LOOP DETECTOR LANE SETUPS

15

16

17

18
19

4.1

Entry Lane Only

4.2 Exit Lane Only

4.3 2-Way Traffic Lane

4.4 Ticket Spitter Entry Lane
4.5 Operator Timer ON Entry Lane (No Down Loop)

15

SECTION 3 - INSTALLATION OF AUTO SPIKE SYSTEM

12

13

14

3.1 Connect Sections Together on Concrete Pad
3.2 Test

Spikes

3.4 Secure EACH Section to Concrete

12

This manual is related to the following products: