Controlled Products Systems Group 1603-080 User Manual
Page 4
1603-065-T-4-13
2
SPECIFICATIONS
1
UL 325 Entrapment Protection
Safety Information for Vertical Barrier Arm and Spikes
3
4-5
SECTION 1 - INSTALLATION OF OPERATOR
6
6
7
7
8
1.1
Operator Positioning and Conduit Requirements
1.2
Concrete Pad Requirements
1.3 Mount
Operator
1.4
Dual Operator Installation (Primary/Secondary)
SECTION 2 - WIRING
9
9
9
10
11
2.1
High Voltage Wire Runs
2.2 High Voltage Terminal Connections
2.3 Main
Terminal
Description
2.4 Control
Wiring
SECTION 9 - TECHNICAL INSTRUCTIONS
32
9.1 Maintenance
Schedule
9.2 Diagnostics
Check
9.3 Troubleshooting
9.4 Accessories Parts List
Wiring Schematics
32
33
33-34
35
36-37
SECTION 5 - ARM INSTALLATION
20
5.1 Mounting
Hub
5.2 Mounting Aluminum Arm
20
20
SECTION 6 - ADJUSTMENTS
21
6.1 1601 Circuit Board Description and Adjustments
6.2 DIP-Switch SW 1 and SW 2 Settings
6.3 Magnetic Limit Adjustment
6.4 Reverse Sensor Adjustment
6.5 Manual Operation of Arm and Spikes
21
22-24
25
25
26
SECTION 7 - OPTIONAL CONVENIENCE OPEN SYSTEM
27
7.1 Operating
Mode
7.2 DC System Description
7.3 DIP-Switch
Settings
27
28
28
SECTION 8 - OPTIONAL ACCESSORIES INSTALLATION
29
8.1 Contact Sensor (Reversing Edge)
8.2 Fan
Kit
8.3 Heater
Kit
29
30
31
TABLE OF CONTENTS
SECTION 4 - LOOP DETECTOR LANE SETUPS
15
16
17
18
19
4.1
Entry Lane Only
4.2 Exit Lane Only
4.3 2-Way Traffic Lane
4.4 Ticket Spitter Entry Lane
4.5 Operator Timer ON Entry Lane (No Down Loop)
15
SECTION 3 - INSTALLATION OF AUTO SPIKE SYSTEM
12
13
14
3.1 Connect Sections Together on Concrete Pad
3.2 Test
Spikes
3.4 Secure EACH Section to Concrete
12