Traffic direction, Left, Right – Controlled Products Systems Group 1603-080 User Manual
Page 14

1603-065-T-4-13
12
Sections MUST lay flat, even, straight and centered on concrete.
3.1 Connect Sections Together on Concrete Pad
SECTION 3 - AUTO SPIKE SYSTEM INSTALLATION
The operator and auto spike system must be installed on a flat and level concrete pad with a minimum 6 inch depth (Check local
building codes for restrictions). Reinforced concrete recommended. It is recommended that the “Spike” sections not exceed
9 feet (Three 3-Ft spike sections) for proper operation.
Snap all sections together using male-to-female socket connectors with spikes aligned in UP position.
DO NOT anchor them to the concrete at this time.
Traffic Direction
Note: Operator shown
mounted on the LEFT side
of traffic lane (preferred).
The spikes will retract towards oncoming traffic.
The spikes will be reversed from the left side mounting position and retract away from oncoming traffic.
Operator Mounted on
LEFT
Side of Traffic Lane Preferred
Operator Mounted on
RIGHT
Side of Traffic Lane
Male-to-Female Socket Connectors
Align Spikes
Traffic Direction
Traffic Direction
UP Position
UP Position
RETRACTED Position
RETRACTED Position