Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1807 User Manual
Page 68
10. 4 x 5 Distributor Platform (Optional)
68
PNEG-1807 16"-24" Bucket Elevator Platform and Ladder “X” Series
24" Attach Bottom Clamp Band to Trunking and Knee Brace
1. Slide rods of clamp rod weldment into inside set of holes of clamp bands for 16" assembly. Fasten
together using four (4) 1/2" hex flange nuts.
2. Orient the brace channels so the bends face outwards and line up the brace channel holes with the
holes located near the middle of the 16"-24" long clamp clips. Line up the clamp strut with the same
set of holes as the brace channel and 16"-24" long clamp clip. Fasten all five (5) together using
four (4) 1/2" x 1" bolt and nuts. Attach remaining clamp strut to the end of the 16"-24" clamp clip.
Tighten only finger tight.
3. Assemble the clamp rod weldment, clamp channel and brace channel assembly at same time around
the trunking. Place clamp rod weldment assembly around the trunking leg and line up holes on
16"-24" long clips and clamp channel with the outside set of holes on the clamp rod weldment.
Fasten all three (3) together using six (6) 1/2" x 1" bolts and nuts.
Figure 10D