beautypg.com

Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1807 User Manual

Page 66

background image

10. 4 x 5 Distributor Platform (Optional)

66

PNEG-1807 16"-24" Bucket Elevator Platform and Ladder “X” Series

16" Attach Bottom Clamp Band to Trunking (for 24" Instructions, see

Steps 2

and

3

.)

1. Slide rods of clamp rod weldment into inside set of holes of clamp bands for 16" assembly. Fasten

together using four (4) 1/2" hex flange nuts.

2. Line up the holes on one of the clamp struts with the set of holes closest to the bend on both of the

16"-24" long clamp clips and fasten all three (3) together using four (4) 1/2" x 1" bolt and nuts. Tighten
only finger tight. Next orient the brace channels so the bends face outwards and line up the brace
channel holes with the holes located at the end of the long clamp clips and the remaining clamp strut.
Fasten all five (5) parts together using four (4) 1/2" x 1" bolt and nuts. Tighten finger tight. This will
make up the brace channel assembly.

3. Assemble the clamp rod weldment, clamp channel and brace channel assembly at same time around

the trunking. Place clamp rod weldment assembly around the trunking leg and line up holes on
16"-24" long clips and clamp channel with the outside set of holes on the clamp rod weldment.
Fasten all three (3) together using six (6) 1/2" x 1" bolts and nuts.

(See Figure 10B.)

Figure 10B