Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1807 User Manual
Page 66
10. 4 x 5 Distributor Platform (Optional)
66
PNEG-1807 16"-24" Bucket Elevator Platform and Ladder “X” Series
16" Attach Bottom Clamp Band to Trunking (for 24" Instructions, see
and
1. Slide rods of clamp rod weldment into inside set of holes of clamp bands for 16" assembly. Fasten
together using four (4) 1/2" hex flange nuts.
2. Line up the holes on one of the clamp struts with the set of holes closest to the bend on both of the
16"-24" long clamp clips and fasten all three (3) together using four (4) 1/2" x 1" bolt and nuts. Tighten
only finger tight. Next orient the brace channels so the bends face outwards and line up the brace
channel holes with the holes located at the end of the long clamp clips and the remaining clamp strut.
Fasten all five (5) parts together using four (4) 1/2" x 1" bolt and nuts. Tighten finger tight. This will
make up the brace channel assembly.
3. Assemble the clamp rod weldment, clamp channel and brace channel assembly at same time around
the trunking. Place clamp rod weldment assembly around the trunking leg and line up holes on
16"-24" long clips and clamp channel with the outside set of holes on the clamp rod weldment.
Fasten all three (3) together using six (6) 1/2" x 1" bolts and nuts.
Figure 10B