Grain Systems Bucket Elevtors, Conveyors, Series II Sweeps PNEG-1807 User Manual
Page 20
6. Tie Angles, Ladder Brackets and Safety Cages
20
PNEG-1807 16"-24" Bucket Elevator Platform and Ladder “X” Series
Attach Boot Ladder Support Brackets and Boot Ladder Section
NOTE: Refer to ladder layout images,
NOTE: Ladders can be mounted to either the up-leg or down-leg end of the elevator depending on the
height and head platform hatch location.
NOTE: Both up-leg and down-leg bracket locations are shown in this manual. Actual installation location
on either the up-leg or down-leg will be determined by owner preference.
1. Using the holes indicated based on bucket elevator size in
, attach ladder support brackets
to boot tie angle using 3/8" x 1" hex bolts. Remember to double check if the ladder should start on
the up-leg side or the down-leg side.
a. 16" Down-leg boot bracket: Use 3/8" x 1" hex bolts to attach the ladder support brackets to the
boot tie angle using the holes indicated in
. Note the outer bracket uses the outer most
holes of the tie angle and the inner bracket will have two (2) empty holes beside it on the tie angle.
Figure 6C 16" Boot Bracket Down-Leg
b. 16" Up-leg boot bracket: Use 3/8" x 1" hex bolts to attach the ladder support brackets to the
boot tie angle using the holes indicated in
. Note the outer bracket attaches to the tie
angle with two (2) empty holes remain on the outside.
Figure 6D 16" Boot Bracket Up-Leg