beautypg.com

2 unit installation, Unit installation – Omron CQM1H-CLK21 User Manual

Page 81

background image

58

Unit Installation

Section 3-2

Repeater Unit Indicators

Dimensions (Unit: mm)

3-2

Unit Installation

• The Controller Link Unit is mounted onto a CPU Backplane or Expansion

CPU Backplane for use. For detailed information on into a PLC installation
procedures, refer to the PLC Installation Guide.

• Repeater Units are not mounted to the PLC. They are mounted sepa-

rately with screws or onto a DIN Track.

• A Repeater Unit is not mounted to a PLC Rack, but rather is mounted to

DIN Track or screw-mounted.

Note

1.

Always turn off power to the PLC before mounting the Controller Link Unit
into the Backplane or connecting the Bus Connection Unit.

Name

Color

Status

Meaning

PWR
(Power supply)

Green

Lit

Power supply is ON.

Not lit

Power supply is OFF.

T/R1
(SL1 communicat-
ing)

Yellow

Lit

Transmission signal is being sent or
received.

Not lit

No transmission signal.

TR2
(SL2 2 communicat-
ing)

Yellow

Lit

Transmission signal is being sent or
received.

Not lit

No transmission signal.

75.6

73.3

8

59

Two, 4.5 dia.

(30)

90

21

81

(Unit: mm)

This manual is related to the following products: