3 c200hx/hg/he controller link units, C200hx/hg/he controller link units – Omron CQM1H-CLK21 User Manual
Page 116
93
C200HX/HG/HE Controller Link Units
Section 4-3
Note
1.
Always turn OFF the PLC’s power before setting the terminating resistance
switch.
2.
Turn ON the switch to connect terminating resistance at the nodes at both
ends of the Network and turn OFF the switch at all other nodes. Normal
communication cannot be performed in the Network unless all the nodes
are set properly.
3.
The TER LED indicator will light when the terminating resistance switch is
set to ON.
4.
The default setting is OFF (not connected).
4-3
C200HX/HG/HE Controller Link Units
The following settings are required for a Controller Link Unit used with a
C200HX/HG/HE PLC.
Item
Switch
Page
Node address
Node address switches
Baud rate
Baud rate and operating level switch, pins 1
and 2
Operating level
Baud rate and operating level switch, pin 4)
Terminating resistance
Terminating resistance switch