Chapter 4 equipment list, Module/installation hardware – NEC UNIVERGE NEAX 2000 IPS User Manual
Page 73

UNIVERGE
NEAX
2000 IPS
Request For Proposal (RFP) Reference Guide
Page 4-1
Issue 6
Chapter 4 Equipment List
Module/Installation Hardware
This table shows the names and functions of the modules
.
Equipment Name
Function Name
Remarks
SN1729 PIMMJ 
 
PIM
Port Interface Module (PIM) 
Maximum 64 physical ports per PIM. Houses two batteries for 
protection from short power interruption (for 30 minutes). 
At maximum configuration, the system consists of eight PIM’s, 
and provides a total of 512 physical ports (64 ports × 8). 
 
SN1730 PIMMK 
 
PIM
Port Interface Module (PIM) for Backup CPU System 
Maximum 64 physical ports per PIM. 
Houses two batteries for protection from short power 
interruption (for 30 minutes). 
One PIM is required per Backup CPU System. 
 
COVER PARTS 
ASSEM-A 
 
COVER PARTS
ASSEM
Cover Parts Assembly 
One cover parts assembly is required for each PIM. 
 
SN1545 
BASE 
 
BASE/TOP
ASSEM
Base/Top Cover Assembly 
One base and top cover assembly is required for each stack. 
 
SN1731 
BATTMH 
 
BATTM
Battery Module for housing PIM or CS (ZT) backup batteries 
Houses two pairs of batteries for protection from long power 
interruption (for 3 hours). 
 
 
 
