NEC UNIVERGE NEAX 2000 IPS User Manual
Page 38
Chapter 2 System Architecture
Page 2- 8
UNIVERGE
NEAX
2000 IPS
Request For Proposal (RFP) Reference Guide
Issue 6
Cabling
The internal and external cabling for the
U
NIVERGE
NEAX
2000 IPS is as follows:
Internal Cabling
BUS Cable
The BUS Cable provides a connection between PIM’s for I/O Bus, PCM Bus, and Alarm Bus extension
in a multiple-PIM configuration.
Bus Cable
Name Code
Qty
Remarks
48-TW-0.7 CONN CA
(No. of PIM)-1 0.7 m (2.3ft.)
Power Control Cable
The Power Control Cable provides a connection between the MP and the AC/DC Power Supply for
controlling battery backup function and MJ/MN alarm indication.
Power Control Cable
Name Code
Qty
Remarks
PWR CNT CA-D
1/PIM
Power control cable (for PIMI-PIM7):
BWB - PZ-PW121/122 (Included in
PIM)
PWR CNT CA-E
1/PIM
Power control cable (for PIM0)
BWB - PZ-PW121/122 (Included in
Base and PIM for Dual System)
DC Power Cable
The DC Power Cable provides a connection between the AC/DC Power Supplies for extending the 27
VDC input in a multiple-PIM configuration, when battery backup option is required
.
Power Cable (Internal Battery Option)
Name Code
Qty
Remarks
PWR CA-A
1/2 PIM
DC Power Cable (-27v input)
BATT CA INT
1/PIM
Internal Battery Cable
Power Cable (External Battery Option)
Name Code
Qty
Remarks
PWR CA-A
(No. of PIM) –1= up to 4PIM
(No. of PIM) –2= 5 to 8PIM
DC Power Cable (-27v input)
BATT CA EXT
1/Stack
External Battery Cable
AC Cord
The AC cord provides a connection between the AC/DC Power Card and Base Unit.
AC Cord
Name Code
Qty
Remarks
AC CORD-B-U
1/PIM
AC power cable (Included in PIM)
AC CORD-D-U
1/BASE AC power cable for BASE (Included in BASE)