beautypg.com

Operational mode, Clock modes – Interphase Tech RAS Communications Controller 5536 User Manual

Page 188

background image

Setting Port and Clock Modes

168

Interphase Corporation

When this mode is selected, the text message portion of the
Line Test main dialog box displays the following
synchronization results:

Operational Mode

After a test has completed, you must return the port used for
testing to Operational mode so that it can handle incoming and
outgoing communications.

To return the port to Operational mode, select Operational
mode
on the Port Test Configuration dialog box (shown in

Figure D-2 on page 165

).

Before closing the Line Test utility, you are requested to
restore each port in testing mode to the operational mode.

Clock Modes

In some test configurations (such as back-to-back
configurations), a port must use the remote card clock to
successfully synchronize on the received signal.

Message

Meaning

No error

The receiving bit sequences completed, and
the port found no errors when comparing
sent and received bit sequences.

X bits in error/sec

The port is comparing received bit
sequences with sent bit sequences.
Each erroneous bit found is added, and the
sum is displayed each second.

Not synchronized

The port is unable to recognize what it sent.