Chapter 13. Metro Mirror options and configuration

139

Figure 13-3 Consistency Group: Example 2

In all cases, if each write operation is dependent, the Consistency Group option can keep the
data consistent in the Metro Mirror target volumes until the Consistency Group time-out
occurs. After the time-out value has been exceeded, all held I/O will be released. The
Consistency Group time-out value can be specified at the LSS level.

If each write operation is not dependent, the I/O sequence is not kept in the Metro Mirror
target volumes that are in LSSs with the Consistency Group option specified. In the example
illustrated in Figure 13-4 on page 140, the three write operations are independent. If the
volumes in LSS12 are in an

extended long busy

state and the other volumes in LSS11 and 13

are not, the first and third operations are completed and the second operation is not
completed.

1st

2nd

3rd

dependent write
operation

Application

on

Servers

Completed

Wait

Wait

LSS11

LSS12

LSS13

LSS21

LSS22

LSS23

Source DS6000

Target DS6000