beautypg.com

IBM SY27-0345-06 User Manual

Page 86

background image

3

Fasten the front of the assembly to the front frame using the supplied screws.

4

Insert an optional adapter into the module slot to ensure the adapter fits into
the assembly correctly.

5

Tighten all screws on the assembly.

6

Attach the dc power cable to the connector on the left-hand side of the riser
card assembly. Make sure the connector with the jumper is connected to the
riser card.

7

Connect the jumpers between the base power supply and the adapter power
supply together.

8

Replace the IBM 2210 cover as described in “Reinstalling the Cover” on
page 4-4.

9

Verify that the IBM 2210 is functioning correctly by using “MAP 0210: Verify
Operation” on page 2-23.

Removing the Adapter Enablement Feature

1

Remove the IBM 2210 cover as described in “Removing the Cover” on
page 4-2.

2

Detach the dc power cable from the connector on the left-hand side of the
riser card assembly.

3

Remove the front screws of the assembly from the front frame.

4

Remove the screw that fastens the rear of the assembly to the system board.

5

Carefully lift the assembly and riser board out of the socket on the system
board.

6

Remove the adapter power supply from the power supply cover.

Installing Optional Adapters

Refer to “Handling Static-Sensitive Devices” on page 4-2 before removing or
installing any of the optional adapters.

4-36

2210 Service and Maintenance