beautypg.com

IBM SY27-0345-06 User Manual

Page 42

background image

MAP 0190 (continued)

018 (continued)

Is the RS 232 cable between the terminal and the IBM 2210 grounded cor-
rectly and shielded?
Yes No

019

Ground or shield the cable correctly or replace the cable. Go to “MAP 0210:
Verify Operation” on page 2-23.

020

Is the terminal or the terminal emulator functioning correctly?
Yes No

021

Replace the terminal or the terminal emulator. Go to “MAP 0210: Verify
Operation” on page 2-23.

022

Is the IBM 2210 in an area with high ambient electromagnetic interference?
Yes No

023

Are there power line disturbances?
Yes No

024

The IBM 2210 system board is defective.

Replace the system board. Go to “MAP 0210: Verify Operation” on
page 2-23.

025

Install an uninterruptible power supply to minimize the effects of the power
fluctuations. Go to “MAP 0210: Verify Operation” on page 2-23.

026

Move the IBM 2210 to a more isolated area. Go to “MAP 0210: Verify Operation”
on page 2-23..

027

Go to “MAP 0210: Verify Operation” on page 2-23.

2-20

2210 Service and Maintenance