beautypg.com

3 installing the sfp transceiver – PLANET WGSW-5242 User Manual

Page 30

background image

User’s Manual of WGSW-5242

30

Figure 2-5

Attach brackets to the Managed Switch.

You must use the screws supplied with the mounting brackets. Damage caused to the parts by

using incorrect screws would invalidate the warranty.

Step3:

Secure the brackets tightly.

Step4:

Follow the same steps to attach the second bracket to the opposite side.

Step5:

After the brackets are attached to the Managed Switch, use suitable screws to securely attach the brackets to the rack,

as shown in

Figure 2-6

.

Figure 2-6

Mounting Managed Switch in a Rack

Step6:

Proceeds with the steps 4 and steps 5 of session 2.2.1 Desktop Installation to connect the network cabling and supply

power to the Managed Switch.

2.2.3 Installing the SFP transceiver

The sections describe how to insert an SFP transceiver into an SFP slot.

The SFP transceivers are hot-pluggable and hot-swappable. You can plug-in and out the transceiver to/from any SFP port

without having to power down the Managed Switch. As the

Figure 2-7

appears.