KACO Powador 3200 - 6600 User Manual
Page 38

EN
EN
Configuration and Operation
Page 38
Operating Instructions for Powador 3200-6600_EN
Authorised electrician
Coun-
try-spec.
Settings
Menu
level
Display/
setting
Action in this menu/meaning
AT
1
2
3
3
Undervoltage
shutdown
Displays the limit values for undervoltage or overvoltage
shutdown.
"
Define limit values for undervoltage or overvoltage
shutdown.
Overvoltage
shutdown
AU, DK,
GR-(M/I),
GB-G59, PT,
KR, SI
Line undervoltage/
overvoltage switch-
off
If the grid frequency exceeds or drops below the con-
figured values, the inverter switches off. The minimum
switch-off threshold can be set in 1 V increments.
"
Configure the switch-off values for undervoltage and
overvoltage.
ES, UD,
IT-CEI021,
GB-G59
Line underfre-
quency/
overfrequency shut-
down
The inverter continuously monitors the grid frequency.
If the grid frequency exceeds or drops below the config-
ured values, the inverter switches off.
"
Set limit values for fast and slow underfrequency
shutdown in 0.1 Hz increments
"
Enter the shutdown threshold for fast and slow over-
voltage shutdown.
AT, DE-NSP,
DE-VDN,
BE, AU, DK,
GR-(M/I), BG,
CZ, FR, PF, PT,
KR, SI
Under-/over-
frequency
shutdown
Shows the minimum/maximum allowable grid frequency.
"
Set limit values for underfrequency and overfre-
quency switch-off in 0.1 Hz increments
All countries
Minimum/
maximum
connection voltage
"
Set the shutdown threshold for the minimum and
maximum connection voltage:
NOTE: The limit values cannot be edited for DE-NSP,
DE-VDN and BE.
All countries
Minimum/
maximum
connection fre-
quency
Shows the minimum/maximum allowable grid frequency.
"
Set limit values for minimum and maximum connec-
tion frequency in 0.1 Hz increments.
NOTE: The limit values cannot be edited for DE-NSP,
DE-VDN and BE.
All countries
(not UD)
Three-phase
grid monitoring
Offers the option of activating three-phase grid monitor-
ing. During this process, single-phase grid monitoring is
deactivated.
"
Set grid monitoring.
DE-NSP, BE,
IL, UD
Connect time
"
Set connect time for grid monitoring after fault or
device start in 1 sec. increments.
All countries
(not GB)
Selection P(f)
Offers the option of regulating the active power depend-
ing on the frequency by two different processes.
"
Activate P(f) mode 1 or mode 2.
NOTE: For DE-NSP and BE, only Mode 2 is permitted.
For IT-CEI021 and DE-MSP is, only Mode 1 is permitted.
P(f) parameter for the countries/mains types shown in
bold cannot be edited.