6 configuring the country data set, 7 deactivating the webconnect function, Configuring the country data set – SMA SB 240 User Manual
Page 47: Deactivating the webconnect function

☐ The changes to the grid-relevant parameters must be approved by the responsible grid
operator.
☐ When changing grid-relevant parameters, the SMA Grid Guard code must be available (see
the Certificate "Order Form for the SMA Grid Guard Code" at
Procedure:
1. Access the Sunny Explorer user interface.
2. If required, enter the SMA Grid Guard code.
3. Select and set the desired parameter.
4. Save settings.
8.6 Configuring the Country Data Set
By default, the Sunny Multigate is set to a specific country data set. You can find the country data
set to which the Sunny Multigate has been set on the enclosed supplementary sheet with the default
settings or on the type label. Each country data set contains various operating parameters, which
can be individually set according to the respective country. You can change the parameters by
means of a communication product.
The country data set must be set correctly.
If you select a country data set which is not valid for your country and purpose, it can cause a
disturbance in the PV system and lead to problems with the grid operator. When selecting the
country data set, you must always observe the locally applicable standards and directives as
well as the properties of the PV system (e.g. PV system size, grid-connection point).
• If you are not sure which country data set is valid for your country or purpose, contact
your grid operator for information on which country data set is to be configured.
The basic procedure for changing operating parameters is explained in another section (see
Section 8.5 "Changing Operating Parameters", page 46).
Procedure:
• Select the parameter Default or Set country standard and adjust the required country data
set.
8.7 Deactivating the Webconnect Function
Requirements:
☐ The PV system must be commissioned (see Section 7 "Commissioning the PV System", page 42
☐ A computer with an Ethernet interface must be available.
☐ Sunny Explorer from software version 1.06 must be installed on the computer.
Procedure:
1. Access the Sunny Explorer user interface.
2. Under Settings > External Communication, select the parameter Webconnect
functionality switched on and set to No.
3. Save settings.
8 Configuration
SMA Solar Technology AG
Installation Manual
47