4 mounting the sunny multigate, 1 mounting the sunny multigate on the top-hat rail, 2 mounting the sunny multigate on the wall – SMA SB 240 User Manual
Page 28: Mounting the sunny multigate, Mounting the sunny multigate on the top-hat rail, Mounting the sunny multigate on the wall

5.4 Mounting the Sunny Multigate
5.4.1
Mounting the Sunny Multigate on the Top-Hat Rail
Additionally required mounting material (not included in the scope of delivery):
☐ Distribution box complying with the installation site requirements according to degree of
protection IP20
☐ Top-hat rail (DIN rail) suitable for the distribution box (width: 35 mm, length: 235 mm).
Procedure:
1. For mounting on a top-hat rail, attach the
Sunny Multigate to the top-hat rail from above,
and hook it in.
☑ The Sunny Multigate snaps into place.
2. Make sure that the Sunny Multigate is securely in place.
5.4.2
Mounting the Sunny Multigate on the Wall
Additionally required mounting material (not included in the scope of delivery):
☐ Distribution box complying with the installation site requirements according to degree of
protection IP20
☐ Four screws suitable for the size of the press-out brackets of the Sunny Multigate and for the
material of the distribution box. The maximum permissible height of the screw head of 6 mm
must not be exceeded.
Procedure:
1.
Danger to life due to electric shock
If screws or conductors on the connecting terminal plate are touched, there is a risk of electric
shock.
• To avoid contact between screw and conductor, only use screws with a maximum head
height of 6 mm for mounting on the brackets.
5 Mounting
SMA Solar Technology AG
Installation Manual
SMA-SB240-IA-en-12
28