SMA SB 240 User Manual
Page 13

Position
Quantity
Designation
D
1
Label with registration ID (RID) and identification key (PIC)
for registration in Sunny Portal**
E
1
Installation manual for Sunny Boy and Sunny Multigate,
mounting overview, supplementary sheet with default set-
tings
* Last inverter: The inverter that is located at the end of the PV system and not directly connected to the
Sunny Multigate but only to one other inverter, is called the "last inverter" in this document. An AC pin
connector remains unused on the last inverter and must be closed with a protective cap.
** Keep this label with your access data for registration in Sunny Portal. The access data can be found on
the Sunny Multigate type label.
AC Cable and DC Plug
Figure 3: Components included in the scope of delivery of the AC cable and the DC plug
Position
Quantity
Designation
A
1
AC cable with two connectors for connecting two inverters
or for connecting the first inverter* to the AC field plug
B
1
DC plug with two DC connectors**
* First inverter: The inverter that is located at the beginning of the PV system and is directly connected to
the Sunny Multigate via the AC cable is called "first inverter" in this document.
** The DC connectors illustrated may deviate from your order.
3 Scope of Delivery
SMA Solar Technology AG
Installation Manual
13
SMA-SB240-IA-en-12