beautypg.com

5 connecting additional grounding, Connecting additional grounding – SMA SB 240 User Manual

Page 36

background image

• Hint: The given torque setting only applies to the torque wrench specified by SMA Solar

Technology AG. The value to be set on the torque wrench is lower than the actual value
(for more information on the calculation of the torque to be set, go to www.stahlwille.com
). A torque wrench consists of the following components: torque wrench (basic device),
square insertion tool and crow's foot wrench.

3. Make sure that the screw connection of the plug enclosure is securely fastened.

6.5 Connecting Additional Grounding

If a second grounding conductor or equipotential bonding is locally required, you can also ground
the inverter enclosure. This prevents touch current if the original grounding conductor fails.
You can ground each inverter separately or connect several inverters with one another.

Procedure:

• Connect the grounding conductor to the equipotential bonding of the AC distribution board.

6.6 Connecting the First Inverter to the Sunny Multigate

6.6.1

Connecting the AC Cable to the AC Field Plug or to the
Junction Box

There are two ways to connect the first inverter to the Sunny Multigate on the AC side:

• Connection with the AC field plug included in the delivery
• Connection via a junction box with integrated feed-through terminal

Cabling with AC Field Plug

Figure 18: AC cabling of the entire PV system with AC field plug

Procedure:

1.

Danger to life due to electric shock
Do not connect the AC field plug under load.

• Make sure that the two-pole circuit breaker of the Sunny Multigate is switched off and

cannot be reconnected.

• Make sure that the PV modules are covered.

6 Electrical Connection

SMA Solar Technology AG

Installation Manual

SMA-SB240-IA-en-12