Cycle run – HEIDENHAIN iTNC 530 (340 49x-06) Cycle programming User Manual
Page 109

HEIDENHAIN iTNC 530
109
4.3 RIGID T
A
PPING without a Floati
ng T
a
p Holder NEW (Cy
c
le 207
,
DIN/ISO:
G207)
4.3 RIGID TAPPING without a
Floating Tap Holder NEW (Cycle 
207, DIN/ISO: G207)
Cycle run
The TNC cuts the thread without a floating tap holder in one or more 
passes.
1
The TNC positions the tool in the spindle axis at rapid traverse FMAX 
to the entered setup clearance above the workpiece surface.
2
The tool drills to the total hole depth in one movement.
3
Once the tool has reached the total hole depth, the direction of 
spindle rotation is reversed and the tool is retracted to the setup 
clearance at the end of the dwell time. If programmed, the tool 
moves to the 2nd setup clearance at FMAX.
4
The TNC stops the spindle turning at setup clearance.
                    This manual is related to the following products:                                    
                                                                        