beautypg.com

Power up – Grass Valley Network Attached Storage System Serial ATA Network User Guide v.1.0.04 User Manual

Page 36

background image

Power Up

Digital News Production

35

Power Up

Once the NewsShare NAS system is cabled, power on the system:

1. Power up the controllers by pressing the power switches as shown.

2. To power up the server nodes, remove the front panel, and press the On/Off

switch.

3. When the server nodes are powered up, replace the server node front panels.

On/Off Switch

Front Panel